RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0615005152 - Archived data from Wed, 07. October 2020 15:44:01 CEST


This is all the information about APD 0615005152. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0615005152
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D01
Break-through voltage: 450 V
Voltage for Gain 100 (T=+25°C): 421.6 V
Dark current: 9.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 211
Position in Box: 38
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 421.9484644 V     T = -25 °C: 384.5452523 V
Voltage for Gain 150: T = +20 °C: 430.0845278 V     T = -25 °C: 392.6135787 V
Voltage for Gain 200: T = +20 °C: 434.6170347 V     T = -25 °C: 397.1759969 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.522062162 V-1     T = -25 °C: 4.322143464 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.491689904 V-1     T = -25 °C: 8.714784398 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.57852389 V-1     T = -25 °C: 12.40314875 V-1
Break-through voltage: T = +20 °C: 439.9615919 V     T = -25 °C: 412.907592 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:15:32 CET jreher Updated box and position via API.
07. Oct 2020 15:44:01 CEST jreher Updated APD location via API.
11. Aug 2020 17:44:00 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:26:07 CEST jreher Updated box and position via API.
28. Nov 2019 13:32:23 CET spankonin Updated APD batch assignment via API.
28. Nov 2019 13:25:20 CET spankonin Updated APD batch assignment via API.
28. Nov 2019 12:50:43 CET spankonin Updated box and position via API.
27. Nov 2019 20:06:18 CET jreher Updated APD location via API.
25. Nov 2019 17:27:19 CET jreher Updated box and position via API.
25. Nov 2019 15:23:30 CET spankonin Updated APD batch assignment via API.
31. Oct 2019 16:57:52 CET spankonin Updated APD location via API.
18. Jun 2019 10:18:31 CEST Tobias Imported from Hamamatsu datasheet.