RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0615005135 - Archived data from Tue, 11. August 2020 17:48:38 CEST


This is all the information about APD 0615005135. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0615005135
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C08
Break-through voltage: 448 V
Voltage for Gain 100 (T=+25°C): 420.7 V
Dark current: 13.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 249
Position in Box: 15
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 423.2990121 V     T = -25 °C: 384.8373466 V
Voltage for Gain 150: T = +20 °C: 430.3083595 V     T = -25 °C: 392.7275838 V
Voltage for Gain 200: T = +20 °C: 434.4229688 V     T = -25 °C: 397.0781562 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.387029271 V-1     T = -25 °C: 4.605738588 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 19.82890645 V-1     T = -25 °C: 9.191544735 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.66974497 V-1     T = -25 °C: 14.4213691 V-1
Break-through voltage: T = +20 °C: 439.9848126 V     T = -25 °C: 411.2231767 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:20 CET jreher Updated box and position via API.
11. Aug 2020 17:48:38 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:32:19 CEST jreher Updated box and position via API.
27. Nov 2019 20:13:02 CET jreher Updated APD location via API.
25. Nov 2019 17:29:57 CET jreher Updated box and position via API.
21. Nov 2019 16:54:40 CET spankonin Updated APD location via API.
21. Nov 2019 16:39:10 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:30 CEST Tobias Imported from Hamamatsu datasheet.