RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0614005130 - Archived data from Tue, 11. August 2020 17:48:37 CEST


This is all the information about APD 0614005130. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0614005130
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A10
Break-through voltage: 458 V
Voltage for Gain 100 (T=+25°C): 430.1 V
Dark current: 13.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 249
Position in Box: 10
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 431.3277814 V     T = -25 °C: 393.9729753 V
Voltage for Gain 150: T = +20 °C: 439.4329471 V     T = -25 °C: 401.9729455 V
Voltage for Gain 200: T = +20 °C: 439.613902 V     T = -25 °C: 406.3984273 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.375871333 V-1     T = -25 °C: 4.546271752 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.290390374 V-1     T = -25 °C: 9.033717389 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 8.290390374 V-1     T = -25 °C: 13.35965945 V-1
Break-through voltage: T = +20 °C: 440.0026808 V     T = -25 °C: 415.0103857 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:20 CET jreher Updated box and position via API.
11. Aug 2020 17:48:37 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:32:19 CEST jreher Updated box and position via API.
27. Nov 2019 20:13:02 CET jreher Updated APD location via API.
25. Nov 2019 17:29:57 CET jreher Updated box and position via API.
21. Nov 2019 16:54:40 CET spankonin Updated APD location via API.
21. Nov 2019 16:39:10 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:30 CEST Tobias Imported from Hamamatsu datasheet.