RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0614005129 - Archived data from Tue, 11. August 2020 17:48:37 CEST


This is all the information about APD 0614005129. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0614005129
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D10
Break-through voltage: 444 V
Voltage for Gain 100 (T=+25°C): 416.4 V
Dark current: 14 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 249
Position in Box: 9
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 417.1624745 V     T = -25 °C: 379.4653954 V
Voltage for Gain 150: T = +20 °C: 425.1418882 V     T = -25 °C: 387.4164732 V
Voltage for Gain 200: T = +20 °C: 429.5541613 V     T = -25 °C: 391.8100786 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.462671363 V-1     T = -25 °C: 4.418899182 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.788987771 V-1     T = -25 °C: 8.566880086 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.36967473 V-1     T = -25 °C: 14.96263299 V-1
Break-through voltage: T = +20 °C: 440.0152063 V     T = -25 °C: 406.5035861 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:19 CET jreher Updated box and position via API.
11. Aug 2020 17:48:37 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:32:19 CEST jreher Updated box and position via API.
27. Nov 2019 20:13:02 CET jreher Updated APD location via API.
25. Nov 2019 17:29:57 CET jreher Updated box and position via API.
21. Nov 2019 16:54:40 CET spankonin Updated APD location via API.
21. Nov 2019 16:39:10 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:29 CEST Tobias Imported from Hamamatsu datasheet.