RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0614005112 - Archived data from Tue, 11. August 2020 17:48:42 CEST


This is all the information about APD 0614005112. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0614005112
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B11
Break-through voltage: 452 V
Voltage for Gain 100 (T=+25°C): 424.1 V
Dark current: 12.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 249
Position in Box: 32
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 425.5574471 V     T = -25 °C: 387.5585443 V
Voltage for Gain 150: T = +20 °C: 433.1625743 V     T = -25 °C: 395.3912582 V
Voltage for Gain 200: T = +20 °C: 437.3970277 V     T = -25 °C: 399.7426484 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.537952427 V-1     T = -25 °C: 4.413818427 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.105735134 V-1     T = -25 °C: 8.650015213 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.34290666 V-1     T = -25 °C: 15.2519847 V-1
Break-through voltage: T = +20 °C: 440.0194274 V     T = -25 °C: 414.9654983 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:22 CET jreher Updated box and position via API.
11. Aug 2020 17:48:42 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:32:20 CEST jreher Updated box and position via API.
27. Nov 2019 20:13:03 CET jreher Updated APD location via API.
25. Nov 2019 17:29:59 CET jreher Updated box and position via API.
21. Nov 2019 16:54:42 CET spankonin Updated APD location via API.
21. Nov 2019 16:39:11 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:28 CEST Tobias Imported from Hamamatsu datasheet.