RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0809007869 - Archived data from Tue, 11. August 2020 17:33:48 CEST


This is all the information about APD 0809007869. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0809007869
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D04
Break-through voltage: 420 V
Voltage for Gain 100 (T=+25°C): 392 V
Dark current: 3.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 186
Position in Box: 9
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 391.8083917 V     T = -25 °C: 355.3123751 V
Voltage for Gain 150: T = +20 °C: 399.7429551 V     T = -25 °C: 362.9308019 V
Voltage for Gain 200: T = +20 °C: 404.1363939 V     T = -25 °C: 367.2087589 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.627881863 V-1     T = -25 °C: 4.652895091 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.170266491 V-1     T = -25 °C: 9.258444453 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.25973074 V-1     T = -25 °C: 14.48837462 V-1
Break-through voltage: T = +20 °C: 419.6824634 V     T = -25 °C: 382.9797777 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:12:18 CET jreher Updated box and position via API.
11. Aug 2020 17:33:48 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:01:54 CET jreher Updated APD location via API.
25. Nov 2019 17:25:31 CET jreher Updated box and position via API.
13. Aug 2019 12:16:53 CEST jreher Updated APD location via API.
07. Aug 2019 14:04:05 CEST markus.moritz
07. Aug 2019 14:03:59 CEST markus.moritz
05. Aug 2019 17:06:07 CEST jreher Updated APD batch assignment via API.
22. Jun 2016 15:26:11 CEST Tobias Imported from Hamamatsu datasheet.