RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0614005106 - Archived data from Tue, 11. August 2020 17:48:40 CEST


This is all the information about APD 0614005106. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0614005106
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G05
Break-through voltage: 441 V
Voltage for Gain 100 (T=+25°C): 413.4 V
Dark current: 15.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 249
Position in Box: 26
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 413.4034443 V     T = -25 °C: 376.3831887 V
Voltage for Gain 150: T = +20 °C: 421.3134487 V     T = -25 °C: 384.2156218 V
Voltage for Gain 200: T = +20 °C: 425.68073 V     T = -25 °C: 388.5608133 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.405788189 V-1     T = -25 °C: 4.482952918 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.614695399 V-1     T = -25 °C: 8.794356561 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.00109185 V-1     T = -25 °C: 15.44593986 V-1
Break-through voltage: T = +20 °C: 439.9040898 V     T = -25 °C: 404.2702587 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:21 CET jreher Updated box and position via API.
11. Aug 2020 17:48:40 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:32:20 CEST jreher Updated box and position via API.
27. Nov 2019 20:13:03 CET jreher Updated APD location via API.
25. Nov 2019 17:29:58 CET jreher Updated box and position via API.
21. Nov 2019 16:54:41 CET spankonin Updated APD location via API.
21. Nov 2019 16:39:11 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:27 CEST Tobias Imported from Hamamatsu datasheet.