RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0614005080 - Archived data from Wed, 07. October 2020 15:44:10 CEST


This is all the information about APD 0614005080. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0614005080
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A08
Break-through voltage: 450 V
Voltage for Gain 100 (T=+25°C): 421.5 V
Dark current: 15.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 247
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 421.9625006 V     T = -25 °C: 384.8980322 V
Voltage for Gain 150: T = +20 °C: 429.8701316 V     T = -25 °C: 392.7376303 V
Voltage for Gain 200: T = +20 °C: 434.2410406 V     T = -25 °C: 397.0724716 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.57096481 V-1     T = -25 °C: 4.631258585 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.07972566 V-1     T = -25 °C: 9.318882411 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.22416189 V-1     T = -25 °C: 14.54662977 V-1
Break-through voltage: T = +20 °C: 440.0090628 V     T = -25 °C: 412.582493 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:03 CET jreher Updated box and position via API.
07. Oct 2020 15:44:10 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:15 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:31:58 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:39 CET jreher Updated APD location via API.
25. Nov 2019 17:29:47 CET jreher Updated box and position via API.
21. Nov 2019 16:53:19 CET spankonin Updated APD location via API.
21. Nov 2019 16:44:12 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:25 CEST Tobias Imported from Hamamatsu datasheet.