RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0613005062 - Archived data from Wed, 07. October 2020 15:44:17 CEST


This is all the information about APD 0613005062. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0613005062
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C07
Break-through voltage: 451 V
Voltage for Gain 100 (T=+25°C): 422.9 V
Dark current: 15.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 248
Position in Box: 13
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 423.4746527 V     T = -25 °C: 386.2436301 V
Voltage for Gain 150: T = +20 °C: 431.3998922 V     T = -25 °C: 394.1152794 V
Voltage for Gain 200: T = +20 °C: 435.770236 V     T = -25 °C: 398.4711809 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.400577152 V-1     T = -25 °C: 4.488264081 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.569808456 V-1     T = -25 °C: 8.867485695 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.87965065 V-1     T = -25 °C: 15.57506934 V-1
Break-through voltage: T = +20 °C: 439.9899959 V     T = -25 °C: 413.2480963 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:12 CET jreher Updated box and position via API.
07. Oct 2020 15:44:17 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:28 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:32:09 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:51 CET jreher Updated APD location via API.
25. Nov 2019 17:29:52 CET jreher Updated box and position via API.
21. Nov 2019 16:54:02 CET spankonin Updated APD location via API.
21. Nov 2019 16:42:07 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:24 CEST Tobias Imported from Hamamatsu datasheet.