Serial: 0613005057
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 451 V
Voltage for Gain 100 (T=+25°C): 422.9 V
Dark current: 16.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 248
Position in Box: 8
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 423.1113942 V     T = -25 °C: 386.1496242 V
Voltage for Gain 150: T = +20 °C: 431.058526 V     T = -25 °C: 394.0326569 V
Voltage for Gain 200: T = +20 °C: 435.4624217 V     T = -25 °C: 398.3963392 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.495967243 V-1     T = -25 °C: 4.534448916 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.880918766 V-1     T = -25 °C: 8.964449423 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.81343974 V-1     T = -25 °C: 13.99523893 V-1
Break-through voltage: T = +20 °C: 440.0189814 V     T = -25 °C: 413.4253264 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:11 CET jreher Updated box and position via API.
07. Oct 2020 15:44:16 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:26 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:32:09 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:51 CET jreher Updated APD location via API.
25. Nov 2019 17:29:52 CET jreher Updated box and position via API.
21. Nov 2019 16:54:02 CET spankonin Updated APD location via API.
21. Nov 2019 16:42:07 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:23 CEST Tobias Imported from Hamamatsu datasheet.