Show Hamamatsu Avalanche Photo Diode 0613005050 - Archived data from Wed, 07. October 2020 15:44:22 CEST
This is all the information about APD 0613005050. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 0613005050 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | In transit to Mainz |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | C14 |
Break-through voltage: | 457 V |
Voltage for Gain 100 (T=+25°C): | 429.6 V |
Dark current: | 15.4 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 253 |
Position in Box: | 31 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | none |
Sent for analysis after irradiation: | none |
Return for assembly: | none |
Irradiation: | |
Date: | none |
Dose used: | none |
Temperature: | none |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 429.538298 V T = -25 °C: 392.6729059 V |
Voltage for Gain 150: | T = +20 °C: 437.4061803 V T = -25 °C: 400.5014171 V |
Voltage for Gain 200: | T = +20 °C: 439.417338 V T = -25 °C: 404.8180528 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.367991675 V-1 T = -25 °C: 4.696176655 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.579265203 V-1 T = -25 °C: 9.410141422 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 10.52860827 V-1 T = -25 °C: 14.87508063 V-1 |
Break-through voltage: | T = +20 °C: 439.9014142 V T = -25 °C: 414.9182787 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 11:20:53 CET | jreher | Updated box and position via API. |
07. Oct 2020 15:44:22 CEST | jreher | Updated APD location via API. |
11. Aug 2020 17:48:51 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:33:04 CEST | jreher | Updated box and position via API. |
27. Nov 2019 20:13:38 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:30:08 CET | jreher | Updated box and position via API. |
21. Nov 2019 16:55:44 CET | spankonin | Updated APD location via API. |
21. Nov 2019 16:36:22 CET | spankonin | Updated APD batch assignment via API. |
18. Jun 2019 10:18:23 CEST | Tobias | Imported from Hamamatsu datasheet. |