RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0613005049 - Archived data from Tue, 11. August 2020 17:48:51 CEST


This is all the information about APD 0613005049. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0613005049
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E10
Break-through voltage: 451 V
Voltage for Gain 100 (T=+25°C): 423.5 V
Dark current: 12.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 253
Position in Box: 30
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 423.9312616 V     T = -25 °C: 386.6761217 V
Voltage for Gain 150: T = +20 °C: 431.8418018 V     T = -25 °C: 394.4306448 V
Voltage for Gain 200: T = +20 °C: 436.1772039 V     T = -25 °C: 398.8151643 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.504367849 V-1     T = -25 °C: 4.126072319 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.01642811 V-1     T = -25 °C: 8.149631427 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.03557322 V-1     T = -25 °C: 14.9723414 V-1
Break-through voltage: T = +20 °C: 439.9516245 V     T = -25 °C: 413.9467385 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:53 CET jreher Updated box and position via API.
07. Oct 2020 15:44:22 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:51 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:04 CEST jreher Updated box and position via API.
27. Nov 2019 20:13:38 CET jreher Updated APD location via API.
25. Nov 2019 17:30:08 CET jreher Updated box and position via API.
21. Nov 2019 16:55:44 CET spankonin Updated APD location via API.
21. Nov 2019 16:36:22 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:23 CEST Tobias Imported from Hamamatsu datasheet.