RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0613005047 - Archived data from Tue, 11. August 2020 17:48:51 CEST


This is all the information about APD 0613005047. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0613005047
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C12
Break-through voltage: 457 V
Voltage for Gain 100 (T=+25°C): 429.2 V
Dark current: 15.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 253
Position in Box: 28
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 429.4956039 V     T = -25 °C: 392.5996483 V
Voltage for Gain 150: T = +20 °C: 437.3407482 V     T = -25 °C: 400.4034593 V
Voltage for Gain 200: T = +20 °C: 439.343889 V     T = -25 °C: 404.706183 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.356288296 V-1     T = -25 °C: 4.704359149 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.582934035 V-1     T = -25 °C: 8.575403854 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 10.53954313 V-1     T = -25 °C: 15.02522012 V-1
Break-through voltage: T = +20 °C: 439.8474603 V     T = -25 °C: 414.8542314 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:52 CET jreher Updated box and position via API.
07. Oct 2020 15:44:22 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:51 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:04 CEST jreher Updated box and position via API.
27. Nov 2019 20:13:38 CET jreher Updated APD location via API.
25. Nov 2019 17:30:08 CET jreher Updated box and position via API.
21. Nov 2019 16:55:44 CET spankonin Updated APD location via API.
21. Nov 2019 16:36:22 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:23 CEST Tobias Imported from Hamamatsu datasheet.