RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0613005034 - Archived data from Wed, 07. October 2020 15:46:10 CEST


This is all the information about APD 0613005034. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0613005034
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E15
Break-through voltage: 450 V
Voltage for Gain 100 (T=+25°C): 424.4 V
Dark current: 13.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 46
Position in Box: 38
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 424.0340377 V     T = -25 °C: 387.0829726 V
Voltage for Gain 150: T = +20 °C: 431.880968 V     T = -25 °C: 394.9015197 V
Voltage for Gain 200: T = +20 °C: 436.2003792 V     T = -25 °C: 399.2142131 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.436170725 V-1     T = -25 °C: 4.442233622 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.555560938 V-1     T = -25 °C: 9.440333761 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.54490994 V-1     T = -25 °C: 14.50107315 V-1
Break-through voltage: T = +20 °C: 439.976891 V     T = -25 °C: 412.5124445 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:54:12 CET jreher Updated box and position via API.
03. Feb 2021 18:19:54 CET jreher Updated box and position via API.
07. Oct 2020 15:46:10 CEST jreher Updated APD location via API.
11. Aug 2020 17:27:23 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:37:11 CET jreher Updated APD location via API.
25. Nov 2019 17:14:34 CET jreher Updated box and position via API.
04. Jul 2019 11:11:54 CEST jreher Updated APD location via API.
18. Jun 2019 13:34:38 CEST jgrochowski Updated APD batch assignment via API.
18. Jun 2019 10:18:21 CEST Tobias Imported from Hamamatsu datasheet.