RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0613005030 - Archived data from Wed, 03. February 2021 18:19:54 CET


This is all the information about APD 0613005030. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0613005030
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E06
Break-through voltage: 448 V
Voltage for Gain 100 (T=+25°C): 419.2 V
Dark current: 13.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 46
Position in Box: 35
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 418.9527043 V     T = -25 °C: 381.6469223 V
Voltage for Gain 150: T = +20 °C: 426.9157362 V     T = -25 °C: 389.5485373 V
Voltage for Gain 200: T = +20 °C: 431.3189485 V     T = -25 °C: 393.9352854 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.446487275 V-1     T = -25 °C: 4.567438125 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.565385989 V-1     T = -25 °C: 8.93818172 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.52450388 V-1     T = -25 °C: 15.29515605 V-1
Break-through voltage: T = +20 °C: 439.973774 V     T = -25 °C: 409.4171653 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:54:11 CET jreher Updated box and position via API.
03. Feb 2021 18:19:54 CET jreher Updated box and position via API.
07. Oct 2020 15:46:10 CEST jreher Updated APD location via API.
11. Aug 2020 17:27:22 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:37:10 CET jreher Updated APD location via API.
25. Nov 2019 17:14:34 CET jreher Updated box and position via API.
04. Jul 2019 11:11:54 CEST jreher Updated APD location via API.
18. Jun 2019 13:34:38 CEST jgrochowski Updated APD batch assignment via API.
18. Jun 2019 10:18:21 CEST Tobias Imported from Hamamatsu datasheet.