RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0612004970 - Archived data from Wed, 07. October 2020 15:44:23 CEST


This is all the information about APD 0612004970. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0612004970
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F11
Break-through voltage: 446 V
Voltage for Gain 100 (T=+25°C): 418.3 V
Dark current: 14.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 253
Position in Box: 41
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 418.3199311 V     T = -25 °C: 381.415053 V
Voltage for Gain 150: T = +20 °C: 426.1659606 V     T = -25 °C: 389.2205108 V
Voltage for Gain 200: T = +20 °C: 430.511477 V     T = -25 °C: 393.5449498 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.459771464 V-1     T = -25 °C: 4.490239692 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.812315989 V-1     T = -25 °C: 8.849178328 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.56676736 V-1     T = -25 °C: 15.61806619 V-1
Break-through voltage: T = +20 °C: 439.9167717 V     T = -25 °C: 408.9867124 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:54 CET jreher Updated box and position via API.
07. Oct 2020 15:44:23 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:53 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:05 CEST jreher Updated box and position via API.
27. Nov 2019 20:13:39 CET jreher Updated APD location via API.
25. Nov 2019 17:30:09 CET jreher Updated box and position via API.
21. Nov 2019 16:55:45 CET spankonin Updated APD location via API.
21. Nov 2019 16:36:23 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:15 CEST Tobias Imported from Hamamatsu datasheet.