RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0612004967 - Archived data from Wed, 07. October 2020 15:44:23 CEST


This is all the information about APD 0612004967. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0612004967
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D14
Break-through voltage: 452 V
Voltage for Gain 100 (T=+25°C): 423.6 V
Dark current: 17.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 253
Position in Box: 38
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 423.7645457 V     T = -25 °C: 386.6126841 V
Voltage for Gain 150: T = +20 °C: 431.7203728 V     T = -25 °C: 394.5256714 V
Voltage for Gain 200: T = +20 °C: 436.1263608 V     T = -25 °C: 398.8953223 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.615202178 V-1     T = -25 °C: 4.345534316 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.071064768 V-1     T = -25 °C: 8.441753213 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.09056631 V-1     T = -25 °C: 14.64075438 V-1
Break-through voltage: T = +20 °C: 439.9487034 V     T = -25 °C: 414.3446225 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:54 CET jreher Updated box and position via API.
07. Oct 2020 15:44:23 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:53 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:05 CEST jreher Updated box and position via API.
27. Nov 2019 20:13:39 CET jreher Updated APD location via API.
25. Nov 2019 17:30:09 CET jreher Updated box and position via API.
21. Nov 2019 16:55:45 CET spankonin Updated APD location via API.
21. Nov 2019 16:36:23 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:15 CEST Tobias Imported from Hamamatsu datasheet.