RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0612004963 - Archived data from Wed, 07. October 2020 15:44:22 CEST


This is all the information about APD 0612004963. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0612004963
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H07
Break-through voltage: 440 V
Voltage for Gain 100 (T=+25°C): 412.5 V
Dark current: 15.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 253
Position in Box: 34
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 413.1289147 V     T = -25 °C: 375.8220839 V
Voltage for Gain 150: T = +20 °C: 421.0507727 V     T = -25 °C: 383.7482512 V
Voltage for Gain 200: T = +20 °C: 425.4434418 V     T = -25 °C: 388.1419617 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.50476768 V-1     T = -25 °C: 4.594643975 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.816194147 V-1     T = -25 °C: 9.099521023 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.38002052 V-1     T = -25 °C: 14.16291557 V-1
Break-through voltage: T = +20 °C: 439.1926825 V     T = -25 °C: 402.6178612 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:53 CET jreher Updated box and position via API.
07. Oct 2020 15:44:22 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:52 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:04 CEST jreher Updated box and position via API.
27. Nov 2019 20:13:39 CET jreher Updated APD location via API.
25. Nov 2019 17:30:09 CET jreher Updated box and position via API.
21. Nov 2019 16:55:45 CET spankonin Updated APD location via API.
21. Nov 2019 16:36:22 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:15 CEST Tobias Imported from Hamamatsu datasheet.