RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3810038802 - Archived data from Tue, 11. August 2020 17:28:56 CEST


This is all the information about APD 3810038802. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3810038802
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381.1 V
Dark current: 12.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 51
Position in Box: 36
EP1 batch: 8
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 28. Jun 2019
Sent for analysis after irradiation: 08. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.1528363 V     T = -25 °C: 346.6740078 V
Voltage for Gain 150: T = +20 °C: 388.8542225 V     T = -25 °C: 353.8281332 V
Voltage for Gain 200: T = +20 °C: 393.1429947 V     T = -25 °C: 357.8389722 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.691499315 V-1     T = -25 °C: 4.881066836 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.465359493 V-1     T = -25 °C: 10.18087134 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.93621456 V-1     T = -25 °C: 16.676428 V-1
Break-through voltage: T = +20 °C: 408.1382528 V     T = -25 °C: 372.4811582 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:54:57 CET jreher Updated box and position via API.
03. Feb 2021 18:20:32 CET jreher Updated box and position via API.
11. Aug 2020 17:28:56 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:31:24 CET jreher Updated APD location via API.
25. Nov 2019 17:14:58 CET jreher Updated box and position via API.
15. Jul 2019 13:02:04 CEST spankonin Updated APD batch assignment via API.
08. Jul 2019 11:08:27 CEST markus.moritz
20. Jun 2019 19:34:17 CEST jreher Updated APD location via API.
17. Jun 2019 17:02:05 CEST spankonin Updated APD batch assignment via API.
17. Jun 2019 17:00:54 CEST spankonin Updated APD batch assignment via API.
25. Apr 2019 15:14:58 CEST Tobias Imported from Hamamatsu datasheet.