RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3808038762 - Archived data from Wed, 03. February 2021 18:20:31 CET


This is all the information about APD 3808038762. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3808038762
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H06
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 379.6 V
Dark current: 8.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 51
Position in Box: 24
EP1 batch: 8
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 28. Jun 2019
Sent for analysis after irradiation: 08. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.3262288 V     T = -25 °C: 345.3700364 V
Voltage for Gain 150: T = +20 °C: 386.1421494 V     T = -25 °C: 352.4241148 V
Voltage for Gain 200: T = +20 °C: 390.5241364 V     T = -25 °C: 356.3647627 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.611336152 V-1     T = -25 °C: 5.116301479 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.208484075 V-1     T = -25 °C: 9.961914803 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.28874407 V-1     T = -25 °C: 16.23711403 V-1
Break-through voltage: T = +20 °C: 405.5885397 V     T = -25 °C: 370.5786397 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:54:55 CET jreher Updated box and position via API.
03. Feb 2021 18:20:31 CET jreher Updated box and position via API.
11. Aug 2020 17:28:55 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:31:24 CET jreher Updated APD location via API.
25. Nov 2019 17:14:57 CET jreher Updated box and position via API.
15. Jul 2019 13:01:45 CEST spankonin Updated APD batch assignment via API.
08. Jul 2019 11:12:06 CEST markus.moritz
20. Jun 2019 19:34:17 CEST jreher Updated APD location via API.
17. Jun 2019 17:02:04 CEST spankonin Updated APD batch assignment via API.
17. Jun 2019 17:00:53 CEST spankonin Updated APD batch assignment via API.
25. Apr 2019 15:14:58 CEST Tobias Imported from Hamamatsu datasheet.