RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3807038727 - Archived data from Tue, 11. August 2020 17:28:53 CEST


This is all the information about APD 3807038727. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3807038727
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G10
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 380 V
Dark current: 11.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 51
Position in Box: 13
EP1 batch: 8
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 28. Jun 2019
Sent for analysis after irradiation: 08. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.6631157 V     T = -25 °C: 344.5552973 V
Voltage for Gain 150: T = +20 °C: 386.3774298 V     T = -25 °C: 351.712942 V
Voltage for Gain 200: T = +20 °C: 390.6973478 V     T = -25 °C: 355.7095862 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.629487938 V-1     T = -25 °C: 4.862007909 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.069125257 V-1     T = -25 °C: 9.445661356 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.26772427 V-1     T = -25 °C: 15.37107776 V-1
Break-through voltage: T = +20 °C: 405.2327843 V     T = -25 °C: 369.8569152 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:54:54 CET jreher Updated box and position via API.
03. Feb 2021 18:20:30 CET jreher Updated box and position via API.
11. Aug 2020 17:28:53 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:31:23 CET jreher Updated APD location via API.
25. Nov 2019 17:14:56 CET jreher Updated box and position via API.
15. Jul 2019 13:01:44 CEST spankonin Updated APD batch assignment via API.
08. Jul 2019 11:16:35 CEST markus.moritz
20. Jun 2019 19:34:16 CEST jreher Updated APD location via API.
17. Jun 2019 17:02:03 CEST spankonin Updated APD batch assignment via API.
17. Jun 2019 17:00:52 CEST spankonin Updated APD batch assignment via API.
25. Apr 2019 15:14:57 CEST Tobias Imported from Hamamatsu datasheet.