RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3802038599 - Archived data from Tue, 11. August 2020 17:28:47 CEST


This is all the information about APD 3802038599. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3802038599
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G04
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 379.2 V
Dark current: 16.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 50
Position in Box: 26
EP1 batch: 6
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 28. Jun 2019
Sent for analysis after irradiation: 08. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.4506512 V     T = -25 °C: 344.357847 V
Voltage for Gain 150: T = +20 °C: 386.0996195 V     T = -25 °C: 351.4999126 V
Voltage for Gain 200: T = +20 °C: 390.3974642 V     T = -25 °C: 355.5091316 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.622604998 V-1     T = -25 °C: 4.933340914 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.21172228 V-1     T = -25 °C: 9.448179572 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.4124469 V-1     T = -25 °C: 15.14899343 V-1
Break-through voltage: T = +20 °C: 405.2762573 V     T = -25 °C: 369.9749203 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:54:48 CET jreher Updated box and position via API.
03. Feb 2021 18:20:24 CET jreher Updated box and position via API.
11. Aug 2020 17:28:47 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:31:13 CET jreher Updated APD location via API.
25. Nov 2019 17:14:52 CET jreher Updated box and position via API.
15. Jul 2019 13:01:30 CEST spankonin Updated APD batch assignment via API.
08. Jul 2019 11:01:43 CEST markus.moritz
20. Jun 2019 19:34:02 CEST jreher Updated APD location via API.
12. Jun 2019 17:17:33 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 17:14:43 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 17:14:26 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:42:52 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:38:57 CEST jreher Updated APD batch assignment via API.
25. Apr 2019 15:14:56 CEST Tobias Imported from Hamamatsu datasheet.