RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3715038527 - Archived data from Tue, 11. August 2020 17:28:44 CEST


This is all the information about APD 3715038527. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3715038527
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.7 V
Dark current: 14.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 50
Position in Box: 1
EP1 batch: 6
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 28. Jun 2019
Sent for analysis after irradiation: 08. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.8273201 V     T = -25 °C: 342.6177636 V
Voltage for Gain 150: T = +20 °C: 384.43609 V     T = -25 °C: 349.7145346 V
Voltage for Gain 200: T = +20 °C: 388.7011092 V     T = -25 °C: 353.697374 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.506062526 V-1     T = -25 °C: 4.918782598 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.952800602 V-1     T = -25 °C: 9.347756207 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.93107891 V-1     T = -25 °C: 17.08816672 V-1
Break-through voltage: T = +20 °C: 403.8937925 V     T = -25 °C: 368.3000464 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:54:45 CET jreher Updated box and position via API.
03. Feb 2021 18:20:21 CET jreher Updated box and position via API.
11. Aug 2020 17:28:44 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:31:12 CET jreher Updated APD location via API.
25. Nov 2019 17:14:50 CET jreher Updated box and position via API.
15. Jul 2019 13:01:28 CEST spankonin Updated APD batch assignment via API.
08. Jul 2019 10:48:23 CEST markus.moritz
20. Jun 2019 19:34:00 CEST jreher Updated APD location via API.
12. Jun 2019 17:17:31 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 17:14:42 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 17:14:25 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:42:50 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:38:55 CEST jreher Updated APD batch assignment via API.
25. Apr 2019 15:14:56 CEST Tobias Imported from Hamamatsu datasheet.