RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0808007839 - Archived data from Tue, 11. August 2020 17:56:22 CEST


This is all the information about APD 0808007839. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0808007839
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379 V
Dark current: 2.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 295
Position in Box: 26
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 97
Position in grid: 12
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 17. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 379 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.1477341 V     T = -25 °C: 343.8046284 V
Voltage for Gain 150: T = +20 °C: 386.9776081 V     T = -25 °C: 351.1112774 V
Voltage for Gain 200: T = +20 °C: 391.3370962 V     T = -25 °C: 355.2278094 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.540627946 V-1     T = -25 °C: 5.043721154 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.026196768 V-1     T = -25 °C: 9.435826011 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.98025272 V-1     T = -25 °C: 14.86407569 V-1
Break-through voltage: T = +20 °C: 407.1468848 V     T = -25 °C: 370.9125408 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:30:21 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:02:59 CEST jreher Updated box and position via API.
05. Feb 2021 11:26:21 CET jreher Updated box and position via API.
11. Aug 2020 17:56:22 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:43 CEST jreher Updated APD location via API.
21. Jul 2020 14:41:34 CEST jreher Updated box and position via API.
19. Dec 2019 15:45:14 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:13 CET jreher Updated box and position via API.
23. Aug 2017 16:05:22 CEST markus.moritz Entered shipped after irradiation date.
10. Aug 2017 15:09:59 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:58:27 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:24 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:24:39 CEST Tobias Imported from Hamamatsu datasheet.