RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3713038496 - Archived data from Wed, 03. February 2021 18:20:02 CET


This is all the information about APD 3713038496. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3713038496
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D01
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 378.2 V
Dark current: 16.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 47
Position in Box: 39
EP1 batch: 5
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 28. Jun 2019
Sent for analysis after irradiation: 08. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.437214 V     T = -25 °C: 343.7881839 V
Voltage for Gain 150: T = +20 °C: 385.132881 V     T = -25 °C: 350.8248839 V
Voltage for Gain 200: T = +20 °C: 389.4166165 V     T = -25 °C: 354.7719081 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.64701769 V-1     T = -25 °C: 4.977175934 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.343266842 V-1     T = -25 °C: 9.417057639 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.8370652 V-1     T = -25 °C: 15.37236253 V-1
Break-through voltage: T = +20 °C: 404.2739192 V     T = -25 °C: 368.800561 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:54:26 CET jreher Updated box and position via API.
03. Feb 2021 18:20:02 CET jreher Updated box and position via API.
11. Aug 2020 17:28:27 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:30:43 CET jreher Updated APD location via API.
25. Nov 2019 17:14:39 CET jreher Updated box and position via API.
15. Jul 2019 13:00:20 CEST spankonin Updated APD batch assignment via API.
08. Jul 2019 10:52:24 CEST markus.moritz
20. Jun 2019 18:29:50 CEST jreher Updated APD location via API.
12. Jun 2019 16:42:49 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:38:54 CEST jreher Updated APD batch assignment via API.
25. Apr 2019 15:14:56 CEST Tobias Imported from Hamamatsu datasheet.