RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0808007837 - Archived data from Wed, 23. August 2017 16:05:22 CEST


This is all the information about APD 0808007837. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0808007837
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C02
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379.3 V
Dark current: 2.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 417
Position in Box: 18
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 97
Position in grid: 8
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 17. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 379.3 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
16. Apr 2021 22:09:07 CEST jreher Updated APD characteristics via API.
16. Apr 2021 10:29:03 CEST jreher Updated APD location via API.
31. Mar 2021 14:15:00 CEST jreher Updated box and position via API.
26. Feb 2021 15:45:02 CET jreher Updated APD batch assignment via API.
03. Feb 2021 18:07:28 CET jreher Updated APD location via API.
23. Aug 2017 16:05:22 CEST markus.moritz Entered shipped after irradiation date.
10. Aug 2017 15:09:59 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:58:27 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:23 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:24:39 CEST Tobias Imported from Hamamatsu datasheet.