RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3712038470 - Archived data from Wed, 03. February 2021 18:20:00 CET


This is all the information about APD 3712038470. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3712038470
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H05
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 379.5 V
Dark current: 20.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 47
Position in Box: 20
EP1 batch: 4
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 28. Jun 2019
Sent for analysis after irradiation: 08. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.0570487 V     T = -25 °C: 342.9577319 V
Voltage for Gain 150: T = +20 °C: 384.7176587 V     T = -25 °C: 350.0885333 V
Voltage for Gain 200: T = +20 °C: 389.0538518 V     T = -25 °C: 354.0968298 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.775779876 V-1     T = -25 °C: 5.150968117 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.574730393 V-1     T = -25 °C: 9.836950358 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 17.06528325 V-1     T = -25 °C: 15.97487932 V-1
Break-through voltage: T = +20 °C: 404.1597629 V     T = -25 °C: 368.777441 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:54:24 CET jreher Updated box and position via API.
03. Feb 2021 18:20:00 CET jreher Updated box and position via API.
11. Aug 2020 17:28:24 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:30:41 CET jreher Updated APD location via API.
25. Nov 2019 17:14:38 CET jreher Updated box and position via API.
15. Jul 2019 12:59:51 CEST spankonin Updated APD batch assignment via API.
08. Jul 2019 10:09:16 CEST markus.moritz
20. Jun 2019 18:29:48 CEST jreher Updated APD location via API.
12. Jun 2019 16:42:47 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:38:52 CEST jreher Updated APD batch assignment via API.
25. Apr 2019 15:14:55 CEST Tobias Imported from Hamamatsu datasheet.