RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0808007835 - Archived data from Tue, 11. August 2020 17:56:21 CEST


This is all the information about APD 0808007835. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0808007835
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H05
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.1 V
Dark current: 2.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 295
Position in Box: 23
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 97
Position in grid: 4
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 17. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 384.1 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.7282988 V     T = -25 °C: 348.8729583 V
Voltage for Gain 150: T = +20 °C: 392.645675 V     T = -25 °C: 356.3485986 V
Voltage for Gain 200: T = +20 °C: 397.0264088 V     T = -25 °C: 360.5634519 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.365043779 V-1     T = -25 °C: 4.942774091 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.289624559 V-1     T = -25 °C: 9.05634039 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.52831517 V-1     T = -25 °C: 16.08266639 V-1
Break-through voltage: T = +20 °C: 410.8472982 V     T = -25 °C: 375.6935699 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:26:21 CET jreher Updated box and position via API.
11. Aug 2020 17:56:21 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:43 CEST jreher Updated APD location via API.
21. Jul 2020 14:41:34 CEST jreher Updated box and position via API.
19. Dec 2019 15:45:14 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:12 CET jreher Updated box and position via API.
23. Aug 2017 16:05:22 CEST markus.moritz Entered shipped after irradiation date.
10. Aug 2017 15:09:59 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:58:27 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:23 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:24:39 CEST Tobias Imported from Hamamatsu datasheet.