RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3710038428 - Archived data from Tue, 11. August 2020 17:28:21 CEST


This is all the information about APD 3710038428. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3710038428
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 3710038428/2703030168
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: H05
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 377.6 V
Dark current: 17.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 47
Position in Box: 3
EP1 batch: 4
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 28. Jun 2019
Sent for analysis after irradiation: 08. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.2718659 V     T = -25 °C: 344.6889322 V
Voltage for Gain 150: T = +20 °C: 385.9274959 V     T = -25 °C: 351.8632007 V
Voltage for Gain 200: T = +20 °C: 390.2181551 V     T = -25 °C: 355.9098308 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.658114515 V-1     T = -25 °C: 4.854216466 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.337084262 V-1     T = -25 °C: 9.977841814 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.68613609 V-1     T = -25 °C: 16.01493349 V-1
Break-through voltage: T = +20 °C: 406.6188909 V     T = -25 °C: 370.028372 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:54:22 CET jreher Updated box and position via API.
03. Feb 2021 18:19:58 CET jreher Updated box and position via API.
11. Aug 2020 17:28:21 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:53:29 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:10 CET jreher Updated box and position via API.
28. Nov 2019 12:30:40 CET jreher Updated APD location via API.
25. Nov 2019 17:14:36 CET jreher Updated box and position via API.
15. Jul 2019 12:59:50 CEST spankonin Updated APD batch assignment via API.
08. Jul 2019 10:14:38 CEST markus.moritz
20. Jun 2019 18:29:47 CEST jreher Updated APD location via API.
12. Jun 2019 16:42:45 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:38:51 CEST jreher Updated APD batch assignment via API.
25. Apr 2019 15:14:54 CEST Tobias Imported from Hamamatsu datasheet.