RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3707038363 - Archived data from Tue, 11. August 2020 17:28:30 CEST


This is all the information about APD 3707038363. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3707038363
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A08
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379.1 V
Dark current: 28.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 48
Position in Box: 9
EP1 batch: 2
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 28. Jun 2019
Sent for analysis after irradiation: 08. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.0609476 V     T = -25 °C: 345.1376986 V
Voltage for Gain 150: T = +20 °C: 386.7594876 V     T = -25 °C: 352.210264 V
Voltage for Gain 200: T = +20 °C: 391.0513525 V     T = -25 °C: 356.1705294 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.821670915 V-1     T = -25 °C: 5.207073119 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.721332476 V-1     T = -25 °C: 10.05384007 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.4720126 V-1     T = -25 °C: 16.65226187 V-1
Break-through voltage: T = +20 °C: 405.7655226 V     T = -25 °C: 370.1526622 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:54:31 CET jreher Updated box and position via API.
03. Feb 2021 18:20:06 CET jreher Updated box and position via API.
11. Aug 2020 17:28:30 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:30:51 CET jreher Updated APD location via API.
25. Nov 2019 17:14:42 CET jreher Updated box and position via API.
15. Jul 2019 13:00:21 CEST spankonin Updated APD batch assignment via API.
08. Jul 2019 09:48:53 CEST markus.moritz
20. Jun 2019 18:30:42 CEST jreher Updated APD location via API.
12. Jun 2019 16:42:41 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:41:50 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:41:17 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:40:39 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:38:46 CEST jreher Updated APD batch assignment via API.
25. Apr 2019 15:14:53 CEST Tobias Imported from Hamamatsu datasheet.