RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0808007830 - Archived data from Tue, 16. February 2021 12:27:12 CET


This is all the information about APD 0808007830. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0808007830
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C05
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379.1 V
Dark current: 3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 295
Position in Box: 19
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 96
Position in grid: 15
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 17. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 09. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 379.1 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.0599538 V     T = -25 °C: 344.6227246 V
Voltage for Gain 150: T = +20 °C: 387.9004726 V     T = -25 °C: 351.9162489 V
Voltage for Gain 200: T = +20 °C: 392.2611678 V     T = -25 °C: 356.012583 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.585080648 V-1     T = -25 °C: 4.763638866 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.09728427 V-1     T = -25 °C: 9.696989791 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.15867563 V-1     T = -25 °C: 15.39960765 V-1
Break-through voltage: T = +20 °C: 407.1765027 V     T = -25 °C: 370.8897867 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 18:56:35 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:27:12 CET jreher Updated box and position via API.
05. Feb 2021 11:26:20 CET jreher Updated box and position via API.
11. Aug 2020 17:56:20 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:43 CEST jreher Updated APD location via API.
21. Jul 2020 14:41:33 CEST jreher Updated box and position via API.
19. Dec 2019 15:45:14 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:12 CET jreher Updated box and position via API.
23. Aug 2017 16:07:10 CEST markus.moritz Entered shipped after irradiation date.
09. Aug 2017 15:43:05 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:57:51 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:23 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:24:38 CEST Tobias Imported from Hamamatsu datasheet.