RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3706038344 - Archived data from Wed, 03. February 2021 18:20:19 CET


This is all the information about APD 3706038344. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3706038344
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D03
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379.1 V
Dark current: 18 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 49
Position in Box: 48
EP1 batch: 2
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 28. Jun 2019
Sent for analysis after irradiation: 08. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.3239553 V     T = -25 °C: 345.1092714 V
Voltage for Gain 150: T = +20 °C: 386.0834573 V     T = -25 °C: 352.1286329 V
Voltage for Gain 200: T = +20 °C: 390.4285846 V     T = -25 °C: 356.0467119 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.714775212 V-1     T = -25 °C: 5.155985842 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.329226458 V-1     T = -25 °C: 10.27396608 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.60791237 V-1     T = -25 °C: 17.08671677 V-1
Break-through voltage: T = +20 °C: 405.7522606 V     T = -25 °C: 370.155427 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:54:43 CET jreher Updated box and position via API.
03. Feb 2021 18:20:19 CET jreher Updated box and position via API.
11. Aug 2020 17:28:43 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:31:04 CET jreher Updated APD location via API.
25. Nov 2019 17:14:49 CET jreher Updated box and position via API.
15. Jul 2019 13:01:14 CEST spankonin Updated APD batch assignment via API.
08. Jul 2019 09:56:39 CEST markus.moritz
20. Jun 2019 18:31:02 CEST jreher Updated APD location via API.
12. Jun 2019 16:42:41 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:41:49 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:41:16 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:40:39 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:38:45 CEST jreher Updated APD batch assignment via API.
25. Apr 2019 15:14:52 CEST Tobias Imported from Hamamatsu datasheet.