RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3703038285 - Archived data from Wed, 03. February 2021 18:20:16 CET


This is all the information about APD 3703038285. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3703038285
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B12
Break-through voltage: 403 V
Voltage for Gain 100 (T=+25°C): 378 V
Dark current: 18.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 49
Position in Box: 20
EP1 batch: 1
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 28. Jun 2019
Sent for analysis after irradiation: 08. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.0228058 V     T = -25 °C: 344.2980831 V
Voltage for Gain 150: T = +20 °C: 384.9068929 V     T = -25 °C: 351.2952821 V
Voltage for Gain 200: T = +20 °C: 389.3145519 V     T = -25 °C: 355.2078093 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.561356675 V-1     T = -25 °C: 5.220217406 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.260268991 V-1     T = -25 °C: 10.01139619 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.68515041 V-1     T = -25 °C: 16.82326567 V-1
Break-through voltage: T = +20 °C: 404.8404817 V     T = -25 °C: 369.3858777 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:54:39 CET jreher Updated box and position via API.
03. Feb 2021 18:20:16 CET jreher Updated box and position via API.
11. Aug 2020 17:28:39 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:31:02 CET jreher Updated APD location via API.
25. Nov 2019 17:14:47 CET jreher Updated box and position via API.
15. Jul 2019 13:01:12 CEST spankonin Updated APD batch assignment via API.
08. Jul 2019 09:50:51 CEST markus.moritz
20. Jun 2019 18:31:00 CEST jreher Updated APD location via API.
12. Jun 2019 16:42:38 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:41:47 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:41:13 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:40:36 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:38:42 CEST jreher Updated APD batch assignment via API.
25. Apr 2019 15:14:51 CEST Tobias Imported from Hamamatsu datasheet.