Show Hamamatsu Avalanche Photo Diode 0808007825 - Archived data from Fri, 05. February 2021 11:26:20 CET
This is all the information about APD 0808007825. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 0808007825 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | E04 |
Break-through voltage: | 406 V |
Voltage for Gain 100 (T=+25°C): | 378.5 V |
Dark current: | 2.5 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 295 |
Position in Box: | 15 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | 96 |
Position in grid: | 5 |
Arrival for irradiation: | 03. Aug 2017 |
Sent for analysis after irradiation: | 17. Aug 2017 |
Return for assembly: | none |
Irradiation: | |
Date: | 09. Aug 2017 |
Dose used: | 45 Gy |
Temperature: | 20 °C |
Position: | 4 |
Bias voltage: | 378.5 V (connected) |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 378.3864241 V T = -25 °C: 343.202643 V |
Voltage for Gain 150: | T = +20 °C: 386.2011494 V T = -25 °C: 350.4853765 V |
Voltage for Gain 200: | T = +20 °C: 390.5467147 V T = -25 °C: 354.5695643 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.507610671 V-1 T = -25 °C: 4.95073954 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.878432346 V-1 T = -25 °C: 9.204115185 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 15.58215125 V-1 T = -25 °C: 16.45425894 V-1 |
Break-through voltage: | T = +20 °C: 405.9833489 V T = -25 °C: 369.9017523 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
26. Oct 2021 15:12:28 CEST | oafedulidis | Assigned to capsule by script |
03. May 2021 15:20:25 CEST | oafedulidis | Updated box and position via API. |
05. Feb 2021 11:26:20 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:56:20 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:41:42 CEST | jreher | Updated APD location via API. |
21. Jul 2020 14:41:33 CEST | jreher | Updated box and position via API. |
19. Dec 2019 15:45:14 CET | spankonin | Updated APD batch assignment via API. |
19. Dec 2019 15:17:12 CET | jreher | Updated box and position via API. |
23. Aug 2017 16:07:10 CEST | markus.moritz | Entered shipped after irradiation date. |
09. Aug 2017 15:43:05 CEST | hans-georg.zaunick | Entered irradiation information. |
07. Aug 2017 16:57:51 CEST | hans-georg.zaunick | Entered arrival for irradiation date. |
04. Aug 2017 03:15:22 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
22. Jun 2016 15:24:38 CEST | Tobias | Imported from Hamamatsu datasheet. |