RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0808007818 - Archived data from Fri, 05. February 2021 11:26:19 CET


This is all the information about APD 0808007818. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0808007818
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G03
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.5 V
Dark current: 9.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 295
Position in Box: 11
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 96
Position in grid: 12
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 17. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 09. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 380.5 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.4853003 V     T = -25 °C: 345.1214564 V
Voltage for Gain 150: T = +20 °C: 388.3724486 V     T = -25 °C: 352.5156253 V
Voltage for Gain 200: T = +20 °C: 392.7560247 V     T = -25 °C: 356.6727355 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.415282734 V-1     T = -25 °C: 4.905135232 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.659251477 V-1     T = -25 °C: 9.027867161 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.08785419 V-1     T = -25 °C: 15.99729809 V-1
Break-through voltage: T = +20 °C: 407.9740215 V     T = -25 °C: 372.335813 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2022 10:54:41 CET oafedulidis Assigned to capsule by script
14. Apr 2021 16:34:19 CEST jreher Updated box and position via API.
05. Feb 2021 11:26:19 CET jreher Updated box and position via API.
11. Aug 2020 17:56:18 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:42 CEST jreher Updated APD location via API.
21. Jul 2020 14:41:33 CEST jreher Updated box and position via API.
19. Dec 2019 15:45:13 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:11 CET jreher Updated box and position via API.
23. Aug 2017 16:07:10 CEST markus.moritz Entered shipped after irradiation date.
09. Aug 2017 15:43:05 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:57:51 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:22 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:24:38 CEST Tobias Imported from Hamamatsu datasheet.