RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0808007813 - Archived data from Tue, 11. August 2020 17:56:18 CEST


This is all the information about APD 0808007813. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0808007813
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C09
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.5 V
Dark current: 3.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 295
Position in Box: 7
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 96
Position in grid: 2
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 17. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 09. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 383.5 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.0435942 V     T = -25 °C: 348.3597377 V
Voltage for Gain 150: T = +20 °C: 391.8929944 V     T = -25 °C: 355.7116476 V
Voltage for Gain 200: T = +20 °C: 396.2341809 V     T = -25 °C: 359.8133743 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.607611089 V-1     T = -25 °C: 4.866306842 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.18983172 V-1     T = -25 °C: 9.976196675 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.47410074 V-1     T = -25 °C: 16.04545191 V-1
Break-through voltage: T = +20 °C: 411.3511873 V     T = -25 °C: 374.9675739 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:26:19 CET jreher Updated box and position via API.
11. Aug 2020 17:56:18 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:42 CEST jreher Updated APD location via API.
21. Jul 2020 14:41:32 CEST jreher Updated box and position via API.
19. Dec 2019 15:45:13 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:11 CET jreher Updated box and position via API.
23. Aug 2017 16:07:10 CEST markus.moritz Entered shipped after irradiation date.
09. Aug 2017 15:43:05 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:57:51 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:22 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:24:38 CEST Tobias Imported from Hamamatsu datasheet.