RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3501037048 - Archived data from Fri, 05. February 2021 11:09:17 CET


This is all the information about APD 3501037048. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3501037048
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E01
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 375.3 V
Dark current: 13.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 163
Position in Box: 28
EP1 batch: 196
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 375.6915474 V     T = -25 °C: 341.4278051 V
Voltage for Gain 150: T = +20 °C: 383.4254153 V     T = -25 °C: 348.6255387 V
Voltage for Gain 200: T = +20 °C: 387.7502551 V     T = -25 °C: 352.6758858 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.799578202 V-1     T = -25 °C: 4.892498563 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.660164966 V-1     T = -25 °C: 10.13157565 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.00026185 V-1     T = -25 °C: 16.0072869 V-1
Break-through voltage: T = +20 °C: 403.5296771 V     T = -25 °C: 367.8238135 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:09:33 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:30 CEST jreher Updated box and position via API.
05. Feb 2021 11:09:17 CET jreher Updated box and position via API.
11. Aug 2020 18:03:35 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:59 CEST jreher Updated APD location via API.
10. Feb 2020 19:00:03 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:59 CET jreher Updated APD location via API.
27. Nov 2019 19:57:44 CET jreher Updated APD location via API.
25. Nov 2019 17:23:48 CET jreher Updated box and position via API.
04. Oct 2019 12:12:04 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:57:54 CEST jreher Updated APD location via API.
21. Dec 2018 11:46:52 CET Tobias Imported from Hamamatsu datasheet.