RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3408037017 - Archived data from Fri, 05. February 2021 11:09:16 CET


This is all the information about APD 3408037017. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3408037017
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C05
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 377.9 V
Dark current: 9.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 163
Position in Box: 15
EP1 batch: 196
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.5992564 V     T = -25 °C: 343.5790886 V
Voltage for Gain 150: T = +20 °C: 386.4066031 V     T = -25 °C: 350.9135269 V
Voltage for Gain 200: T = +20 °C: 390.7494742 V     T = -25 °C: 355.0354733 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.440366275 V-1     T = -25 °C: 4.719870017 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.658656841 V-1     T = -25 °C: 9.606646015 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.05757907 V-1     T = -25 °C: 15.2651085 V-1
Break-through voltage: T = +20 °C: 405.5399482 V     T = -25 °C: 369.8845768 V
   
Notes:


Version history

Time Author Change comment
25. Oct 2021 14:01:46 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:17 CEST jreher Updated box and position via API.
05. Feb 2021 11:09:16 CET jreher Updated box and position via API.
11. Aug 2020 18:03:32 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:58 CEST jreher Updated APD location via API.
10. Feb 2020 19:00:55 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:58 CET jreher Updated APD location via API.
27. Nov 2019 19:57:43 CET jreher Updated APD location via API.
25. Nov 2019 17:23:47 CET jreher Updated box and position via API.
04. Oct 2019 12:12:03 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:57:53 CEST jreher Updated APD location via API.
21. Dec 2018 11:46:52 CET Tobias Imported from Hamamatsu datasheet.