RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3408037004 - Archived data from Fri, 05. February 2021 11:09:15 CET


This is all the information about APD 3408037004. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3408037004
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C08
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.6 V
Dark current: 13.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 163
Position in Box: 3
EP1 batch: 196
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.2336253 V     T = -25 °C: 343.9382257 V
Voltage for Gain 150: T = +20 °C: 387.0611762 V     T = -25 °C: 351.2898736 V
Voltage for Gain 200: T = +20 °C: 391.4359465 V     T = -25 °C: 355.4230058 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.542433403 V-1     T = -25 °C: 4.98211086 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.931928575 V-1     T = -25 °C: 9.264478378 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.87732257 V-1     T = -25 °C: 14.59888483 V-1
Break-through voltage: T = +20 °C: 406.6831903 V     T = -25 °C: 370.3308646 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:14:49 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 16:57:48 CEST jreher Updated box and position via API.
05. Feb 2021 11:09:15 CET jreher Updated box and position via API.
11. Aug 2020 18:03:30 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:57 CEST jreher Updated APD location via API.
10. Feb 2020 19:00:54 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:57 CET jreher Updated APD location via API.
27. Nov 2019 19:57:42 CET jreher Updated APD location via API.
25. Nov 2019 17:23:46 CET jreher Updated box and position via API.
04. Oct 2019 12:12:02 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:57:52 CEST jreher Updated APD location via API.
21. Dec 2018 11:46:52 CET Tobias Imported from Hamamatsu datasheet.