RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3408036975 - Archived data from Tue, 16. February 2021 12:26:08 CET


This is all the information about APD 3408036975. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3408036975
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G11
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 383.1 V
Dark current: 11.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 162
Position in Box: 28
EP1 batch: 195
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.9377984 V     T = -25 °C: 347.3813409 V
Voltage for Gain 150: T = +20 °C: 390.7461402 V     T = -25 °C: 354.8478961 V
Voltage for Gain 200: T = +20 °C: 395.0880692 V     T = -25 °C: 359.0261722 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.634613953 V-1     T = -25 °C: 4.664960954 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.185251883 V-1     T = -25 °C: 9.30473463 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.28827852 V-1     T = -25 °C: 15.10153975 V-1
Break-through voltage: T = +20 °C: 410.169946 V     T = -25 °C: 374.2143156 V
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:04:37 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:26:08 CET jreher Updated box and position via API.
05. Feb 2021 11:09:09 CET jreher Updated box and position via API.
11. Aug 2020 18:03:25 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:55 CEST jreher Updated APD location via API.
05. Feb 2020 15:10:20 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:55 CET jreher Updated APD location via API.
27. Nov 2019 19:57:33 CET jreher Updated APD location via API.
25. Nov 2019 17:23:43 CET jreher Updated box and position via API.
04. Oct 2019 12:11:36 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:57:45 CEST jreher Updated APD location via API.
21. Dec 2018 11:46:51 CET Tobias Imported from Hamamatsu datasheet.