Show Hamamatsu Avalanche Photo Diode 3407036945 - Archived data from Fri, 05. February 2021 11:09:09 CET
This is all the information about APD 3407036945. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 3407036945 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | E03 |
Break-through voltage: | 411 V |
Voltage for Gain 100 (T=+25°C): | 385 V |
Dark current: | 7 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 162 |
Position in Box: | 20 |
EP1 batch: | 195 |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | none |
Sent for analysis after irradiation: | none |
Return for assembly: | none |
Irradiation: | |
Date: | none |
Dose used: | none |
Temperature: | none |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 385.3591198 V T = -25 °C: 349.4994574 V |
Voltage for Gain 150: | T = +20 °C: 393.2247845 V T = -25 °C: 357.0280992 V |
Voltage for Gain 200: | T = +20 °C: 397.5936401 V T = -25 °C: 361.2200202 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.475669822 V-1 T = -25 °C: 4.738819008 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.776879796 V-1 T = -25 °C: 9.346794326 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 15.24882943 V-1 T = -25 °C: 14.51036085 V-1 |
Break-through voltage: | T = +20 °C: 412.7924956 V T = -25 °C: 376.5001569 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
14. Apr 2021 18:52:03 CEST | oafedulidis | Assigned to capsule by script |
16. Feb 2021 12:28:37 CET | jreher | Updated box and position via API. |
05. Feb 2021 11:09:09 CET | jreher | Updated box and position via API. |
11. Aug 2020 18:03:24 CEST | jreher | Updated APD characteristics via API. |
11. Aug 2020 17:52:54 CEST | jreher | Updated APD location via API. |
05. Feb 2020 15:10:19 CET | spankonin | Updated APD batch assignment via API. |
29. Nov 2019 11:49:55 CET | jreher | Updated APD location via API. |
27. Nov 2019 19:57:33 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:23:42 CET | jreher | Updated box and position via API. |
04. Oct 2019 12:11:36 CEST | spankonin | Updated APD batch assignment via API. |
05. Jul 2019 13:57:45 CEST | jreher | Updated APD location via API. |
21. Dec 2018 11:46:51 CET | Tobias | Imported from Hamamatsu datasheet. |