RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3407036941 - Archived data from Tue, 11. August 2020 18:03:23 CEST


This is all the information about APD 3407036941. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3407036941
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G04
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 385.9 V
Dark current: 7.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 162
Position in Box: 17
EP1 batch: 195
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.6169615 V     T = -25 °C: 350.5058064 V
Voltage for Gain 150: T = +20 °C: 393.435547 V     T = -25 °C: 358.1546149 V
Voltage for Gain 200: T = +20 °C: 397.7608114 V     T = -25 °C: 362.363855 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.392320153 V-1     T = -25 °C: 5.286808569 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.627119941 V-1     T = -25 °C: 9.007029916 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.99304807 V-1     T = -25 °C: 14.86448375 V-1
Break-through voltage: T = +20 °C: 412.3575183 V     T = -25 °C: 377.1559273 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 10:39:55 CET oafedulidis Assigned to capsule by script
21. Apr 2021 11:02:33 CEST jreher Updated box and position via API.
05. Feb 2021 11:09:08 CET jreher Updated box and position via API.
11. Aug 2020 18:03:23 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:54 CEST jreher Updated APD location via API.
05. Feb 2020 15:10:19 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:55 CET jreher Updated APD location via API.
27. Nov 2019 19:57:32 CET jreher Updated APD location via API.
25. Nov 2019 17:23:42 CET jreher Updated box and position via API.
04. Oct 2019 12:11:35 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:57:45 CEST jreher Updated APD location via API.
21. Dec 2018 11:46:51 CET Tobias Imported from Hamamatsu datasheet.