RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3406036869 - Archived data from Tue, 11. August 2020 17:55:46 CEST


This is all the information about APD 3406036869. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3406036869
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B10
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.9 V
Dark current: 15.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 161
Position in Box: 19
EP1 batch: 193
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.4186301 V     T = -25 °C: 347.8782617 V
Voltage for Gain 150: T = +20 °C: 391.2336219 V     T = -25 °C: 355.3045539 V
Voltage for Gain 200: T = +20 °C: 395.5764326 V     T = -25 °C: 359.4689781 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.500248495 V-1     T = -25 °C: 4.944888969 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.874440435 V-1     T = -25 °C: 9.176370936 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.47835065 V-1     T = -25 °C: 16.36339827 V-1
Break-through voltage: T = +20 °C: 410.5250587 V     T = -25 °C: 374.3756954 V
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:03:52 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:46 CET jreher Updated box and position via API.
05. Feb 2021 11:09:00 CET jreher Updated box and position via API.
11. Aug 2020 17:55:46 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:49 CEST jreher Updated APD location via API.
16. Dec 2019 16:34:39 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:51 CET jreher Updated APD location via API.
27. Nov 2019 19:57:21 CET jreher Updated APD location via API.
25. Nov 2019 17:23:38 CET jreher Updated box and position via API.
04. Oct 2019 12:10:39 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:57:37 CEST jreher Updated APD location via API.
21. Dec 2018 11:46:50 CET Tobias Imported from Hamamatsu datasheet.