RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3406036859 - Archived data from Fri, 05. February 2021 11:08:59 CET


This is all the information about APD 3406036859. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3406036859
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E10
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.5 V
Dark current: 10.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 161
Position in Box: 12
EP1 batch: 193
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.8836903 V     T = -25 °C: 344.3906097 V
Voltage for Gain 150: T = +20 °C: 387.6966078 V     T = -25 °C: 351.7498919 V
Voltage for Gain 200: T = +20 °C: 392.0318772 V     T = -25 °C: 355.8685913 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.682817254 V-1     T = -25 °C: 4.788353066 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.326397457 V-1     T = -25 °C: 9.785812833 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.53599712 V-1     T = -25 °C: 15.64433308 V-1
Break-through voltage: T = +20 °C: 407.4559835 V     T = -25 °C: 371.0685067 V
   
Notes:


Version history

Time Author Change comment
15. Feb 2021 15:38:18 CET jreher Assigned to capsule by script
05. Feb 2021 11:08:59 CET jreher Updated box and position via API.
18. Dec 2020 13:59:54 CET jreher Updated box and position via API.
11. Aug 2020 17:55:45 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:48 CEST jreher Updated APD location via API.
16. Dec 2019 16:34:39 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:51 CET jreher Updated APD location via API.
27. Nov 2019 19:57:21 CET jreher Updated APD location via API.
25. Nov 2019 17:23:37 CET jreher Updated box and position via API.
04. Oct 2019 12:10:38 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:57:36 CEST jreher Updated APD location via API.
21. Dec 2018 11:46:50 CET Tobias Imported from Hamamatsu datasheet.