RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3406036818 - Archived data from Tue, 16. February 2021 12:26:24 CET


This is all the information about APD 3406036818. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3406036818
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G06
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 385.7 V
Dark current: 8.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 160
Position in Box: 22
EP1 batch: 192
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.7007803 V     T = -25 °C: 349.8270914 V
Voltage for Gain 150: T = +20 °C: 393.5260617 V     T = -25 °C: 357.2634479 V
Voltage for Gain 200: T = +20 °C: 397.847317 V     T = -25 °C: 361.5170013 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.667917722 V-1     T = -25 °C: 4.974361033 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.356053652 V-1     T = -25 °C: 9.084285673 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.72599375 V-1     T = -25 °C: 15.82754301 V-1
Break-through voltage: T = +20 °C: 412.8090928 V     T = -25 °C: 376.6837799 V
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:02:58 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:26:24 CET jreher Updated box and position via API.
05. Feb 2021 11:08:53 CET jreher Updated box and position via API.
11. Aug 2020 17:55:38 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:45 CEST jreher Updated APD location via API.
12. Dec 2019 14:37:02 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:48 CET jreher Updated APD location via API.
27. Nov 2019 19:57:11 CET jreher Updated APD location via API.
25. Nov 2019 17:23:33 CET jreher Updated box and position via API.
04. Oct 2019 12:09:48 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:57:29 CEST jreher Updated APD location via API.
21. Dec 2018 11:46:49 CET Tobias Imported from Hamamatsu datasheet.