RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3404036702 - Archived data from Tue, 11. August 2020 17:55:26 CEST


This is all the information about APD 3404036702. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3404036702
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H06
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 387.9 V
Dark current: 16.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 159
Position in Box: 15
EP1 batch: 190
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.600427 V     T = -25 °C: 351.638665 V
Voltage for Gain 150: T = +20 °C: 395.4856915 V     T = -25 °C: 359.1828822 V
Voltage for Gain 200: T = +20 °C: 399.8586862 V     T = -25 °C: 363.4384535 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.358080819 V-1     T = -25 °C: 4.577556629 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.500675642 V-1     T = -25 °C: 9.033898221 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.65235499 V-1     T = -25 °C: 16.18600689 V-1
Break-through voltage: T = +20 °C: 415.0608988 V     T = -25 °C: 378.8082874 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:58:09 CEST jreher Updated box and position via API.
15. Apr 2021 16:43:18 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:08:44 CET jreher Updated box and position via API.
11. Aug 2020 17:55:26 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:40 CEST jreher Updated APD location via API.
12. Dec 2019 14:38:30 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:44 CET jreher Updated APD location via API.
27. Nov 2019 19:56:59 CET jreher Updated APD location via API.
25. Nov 2019 17:23:28 CET jreher Updated box and position via API.
04. Oct 2019 12:08:56 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:57:21 CEST jreher Updated APD location via API.
21. Dec 2018 11:46:47 CET Tobias Imported from Hamamatsu datasheet.