RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3404036692 - Archived data from Tue, 11. August 2020 17:55:25 CEST


This is all the information about APD 3404036692. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3404036692
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E05
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 383.8 V
Dark current: 6.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 159
Position in Box: 9
EP1 batch: 189
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.9691695 V     T = -25 °C: 348.1374662 V
Voltage for Gain 150: T = +20 °C: 391.8176443 V     T = -25 °C: 355.6065961 V
Voltage for Gain 200: T = +20 °C: 396.1649141 V     T = -25 °C: 359.7634766 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.594936125 V-1     T = -25 °C: 4.778319823 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.147127517 V-1     T = -25 °C: 9.941919309 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.29562517 V-1     T = -25 °C: 15.57715113 V-1
Break-through voltage: T = +20 °C: 411.6811248 V     T = -25 °C: 375.2781979 V
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 13:09:11 CET oafedulidis Assigned to capsule by script
30. Aug 2021 14:07:12 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:08:43 CET jreher Updated box and position via API.
11. Aug 2020 17:55:25 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:39 CEST jreher Updated APD location via API.
12. Dec 2019 14:38:30 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:43 CET jreher Updated APD location via API.
27. Nov 2019 19:56:59 CET jreher Updated APD location via API.
25. Nov 2019 17:23:27 CET jreher Updated box and position via API.
04. Oct 2019 12:08:33 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:57:20 CEST jreher Updated APD location via API.
21. Dec 2018 11:46:47 CET Tobias Imported from Hamamatsu datasheet.