RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3403036598 - Archived data from Tue, 11. August 2020 18:03:11 CEST


This is all the information about APD 3403036598. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3403036598
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C03
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.6 V
Dark current: 5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 158
Position in Box: 6
EP1 batch: 188
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.2384641 V     T = -25 °C: 346.0899565 V
Voltage for Gain 150: T = +20 °C: 389.1154395 V     T = -25 °C: 353.5081587 V
Voltage for Gain 200: T = +20 °C: 393.5182998 V     T = -25 °C: 357.659043 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.515743208 V-1     T = -25 °C: 4.856780939 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.814579629 V-1     T = -25 °C: 8.966914776 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.28296906 V-1     T = -25 °C: 15.89877142 V-1
Break-through voltage: T = +20 °C: 409.4723182 V     T = -25 °C: 373.3007377 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 09:41:10 CET oafedulidis Assigned to capsule by script
03. May 2021 15:20:08 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:08:35 CET jreher Updated box and position via API.
11. Aug 2020 18:03:11 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:35 CEST jreher Updated APD location via API.
17. Feb 2020 18:05:30 CET spankonin Updated APD batch assignment via API.
05. Feb 2020 15:11:06 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:40 CET jreher Updated APD location via API.
27. Nov 2019 19:56:47 CET jreher Updated APD location via API.
25. Nov 2019 17:23:22 CET jreher Updated box and position via API.
04. Oct 2019 12:07:55 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:57:12 CEST jreher Updated APD location via API.
21. Dec 2018 11:46:46 CET Tobias Imported from Hamamatsu datasheet.