RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3403036576 - Archived data from Fri, 05. February 2021 11:08:31 CET


This is all the information about APD 3403036576. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3403036576
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379.8 V
Dark current: 5.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 157
Position in Box: 37
EP1 batch: 187
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.5997202 V     T = -25 °C: 344.4962531 V
Voltage for Gain 150: T = +20 °C: 387.4408981 V     T = -25 °C: 351.8688542 V
Voltage for Gain 200: T = +20 °C: 391.7954125 V     T = -25 °C: 356.0089904 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.410689103 V-1     T = -25 °C: 4.710964974 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.491135825 V-1     T = -25 °C: 9.482152472 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.61125257 V-1     T = -25 °C: 15.00494669 V-1
Break-through voltage: T = +20 °C: 407.6486251 V     T = -25 °C: 371.5400421 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 18:56:25 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:27:08 CET jreher Updated box and position via API.
05. Feb 2021 11:08:31 CET jreher Updated box and position via API.
11. Aug 2020 18:03:08 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:33 CEST jreher Updated APD location via API.
05. Feb 2020 15:11:24 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:38 CET jreher Updated APD location via API.
27. Nov 2019 19:56:38 CET jreher Updated APD location via API.
25. Nov 2019 17:23:20 CET jreher Updated box and position via API.
04. Oct 2019 12:07:31 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:57:06 CEST jreher Updated APD location via API.
21. Dec 2018 11:46:45 CET Tobias Imported from Hamamatsu datasheet.