RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3402036555 - Archived data from Tue, 16. February 2021 12:28:24 CET


This is all the information about APD 3402036555. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3402036555
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D13
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.9 V
Dark current: 10.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 157
Position in Box: 24
EP1 batch: 187
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.1431591 V     T = -25 °C: 346.5493279 V
Voltage for Gain 150: T = +20 °C: 390.0128437 V     T = -25 °C: 353.9892217 V
Voltage for Gain 200: T = +20 °C: 394.4044296 V     T = -25 °C: 358.1549111 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.553823264 V-1     T = -25 °C: 4.714008343 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.965295353 V-1     T = -25 °C: 9.450877888 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.87578093 V-1     T = -25 °C: 14.98631021 V-1
Break-through voltage: T = +20 °C: 409.7832591 V     T = -25 °C: 373.3742466 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:17:54 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:24 CET jreher Updated box and position via API.
05. Feb 2021 11:08:30 CET jreher Updated box and position via API.
11. Aug 2020 18:03:05 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:32 CEST jreher Updated APD location via API.
05. Feb 2020 15:11:23 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:38 CET jreher Updated APD location via API.
27. Nov 2019 19:56:37 CET jreher Updated APD location via API.
25. Nov 2019 17:23:19 CET jreher Updated box and position via API.
04. Oct 2019 12:07:30 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:57:05 CEST jreher Updated APD location via API.
21. Dec 2018 11:46:45 CET Tobias Imported from Hamamatsu datasheet.